Dredging work is currently underway at the Vizze Dam, involving the removal of approximately 3,000 mĀ³ of sediment, with the material being returned to the nearby disposal basin constructed with sheet piles.

Radio-controlled dredger DRP 60

Return of the mixture to the disposal basin