The installation of 170 burgons is currently underway at Italy’s largest run-of-river hydroelectric plant: the Isola Serafini weir.

Pontoon with burgon and laying train

  • Using a special pontoon with a bottom-opening mechanism, the burgons are placed, which are made with a geotextile covering, a metal mesh reinforcement, and a concrete filling.