Cimego Basin: 26,000 mc of Sediment Removed
In November 2024, the sediment removal works from the Cimego basin, located in the Municipality of Borgo Chiese and supplying the Storo hydroelectric power plant managed by Hydro Dolomiti Energia, were completed. Between June 2023 and November 2024, approximately...
Sediment Removal from the Bottom Outlet of the Pavana Dam (PT)
Started in November 2022, dredging work is still ongoing at the Pavana Dam, aiming to remove 6,700 m³ of sediment to restore the functionality of the bottom outlet. The characteristics of the material to be removed (gravelly sand) required the use of a suction-return...
Dredging of the Vizze Dam
Dredging work is currently underway at the Vizze Dam, involving the removal of approximately 3,000 m³ of sediment, with the material being returned to the nearby disposal basin constructed with sheet piles....